Hayat Pakistan Plant Fire Suppresion Project - Update April 2019

22.4.2019
We have made significant progress in our Hayat Pakistan factory fire suppression and prevention project. Some brief facts on the project are as follows;

10 zones of water based ESFR sprinkler systems are fully commisioned and are in operation
All auxilary utility building water based fire systems 
are fully commisioned and are in operation
Undergorund hydrant lines and hydrants together with field type hose reel cabinets are fully commisioned and are in operation
Electrical and Jockey fire pumps systems 
are fully commisioned and are in operation.

We are finalizing foam based suppression system together with CO2 based local application systems